What are the details of the installation of metal custom screens

Installation details of partition screen

1, The installation of metal custom screen before the ground as the basis for horizontal and vertical measurement and marking, find a good fixed point, marked clearly.

2, The metal custom screen is equipped with a border, before the installation of the partition wall, it is necessary to measure and determine the side line and horizontal position to ensure that the installation size and the location of the connected device are accurate. If the interface is rough, it is necessary to use a polishing tool to polish it smooth before installation.

3, Generally speaking, the installation of the partition wall is divided into two ways, respectively, the overall installation of the frame and the horizontal and vertical installation, which has an important relationship with the size of the partition wall.

4. When the metal custom screen is installed as the frame installation method, it is necessary to install the frame after moving to the preset installation position. If the position is accurate, it can be fixed with expansion screws, and then the internal and external profiles are welded, remember that anti-corrosion measures have been done before installation, and after the overall installation of the welding, a careful inspection is carried out. Do a good job of welding leakage and anti-corrosion leakage repair work.

5, The corresponding tools and materials moved to the place, measured with a level into a straight line, the first fixed keel, where the door is installed first, to avoid the keel long. After fixing the ground keel, fix the wall side keel, be sure to use the level side, allow error ≤3mm, in the fixed top keel, connect with the Angle accessories, allow error ≤3mm, the top keel is connected to the ceiling, absolutely stable, the wall is T or cross to use the square column connection, with the keel connected to the square column above, to ensure stable installation. (If the square column is connected to the door, the keel is flush with the square column, and the door is not allowed to be empty by one centimeter, and the Angle code is placed.) Then install the door, the use of accessories cross corner code and corner code to fix the keel and the door frame, the door frame is not allowed to have a gap between the keel on the ground, and then there is a detail after the vertical separation, "the top wire should first top the keel above the fixed height, then the horizontal separation, the top wire should also pay attention to, we must first twist the screws on the vertical keel, in the twist the screws on the horizontal keel, Because the screw on the transverse keel will be affected, and the screw will be offset.